Norac UC5-BC-SM04 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Gartengeräte Norac UC5-BC-SM04 herunter. NORAC UC5-BC-SM04 User Manual [en] [de] Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1

Summers Proportional Main Lift And Enhanced Stability Installation Manual SM04

Seite 2

74.4 Hydraulic Fitting Kit Details (P/N: 44865-30) Item Part Number Name Quantity PictureF02 103312 MALE ADAPTER - 6MB 6MJ 4F03 103839 TEE ADAPT

Seite 3 - Contents

84.5 Hydraulic Fitting Kit Details (P/N: 44865-50) Item Part Number Name QuantityPictureF02 103839 TEE - 6FJXR 6MJT 1F03 104369 PLUG - 6MBP 1F04

Seite 4 - 1 Introduction

95 Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold

Seite 5 - 2 Technical Specifications

106 Ultrasonic Sensor Installation 6.1 Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest seri

Seite 6 - 3 General UC5 System Layout

116.2 Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error.

Seite 7 - 4 Kit Parts

126.3 Wing Sensor Installation 1. The sensor bracket should be oriented forward (ahead of the boom). 2. Typically the best mounting location fo

Seite 8 - 4.2 Hydraulic Plumbing

136.4 Main Lift Sensor Installation 1. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should positio

Seite 9 - 4.3 List of Parts

147 Roll Sensor Installation 7.1 Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine

Seite 10 - 6 M B - 6 M OR X 90

157.2 Roll Sensor Mounting Guidelines: Trapeze-Suspended Booms 1. When mounting the roll sensors, mount one to the trapeze link (boom frame – lo

Seite 11

167.3 Roll Sensor Mounting on a Summers Sprayer Figure 12: Roll Sensor Mounting (Viewed from the rear of sprayer) Figure 13: Ref

Seite 12 - 5 Pre-Install Checklist

Printed in Canada Copyright  2010 by NORAC Systems International Inc. Reorder P/N: UC5-BC-SM04-INST Rev I (Summers Prop Main Lift & Enhanced Stab

Seite 13

178 Module Installation An optional module mounting bracket kit is available for purchase from NORAC. The mounting brackets are compatible with

Seite 14

188.2 Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards

Seite 15

19 Figure 17: Valve Module Bracket Installation 5. Connect the valve module CANbus to cable C01 from the control module. Route cable C02 from

Seite 16

208.3 Input Module 1. Install the input module (E03) on the boom near the Summers valve block. Secure it to the boom using cable ties or option

Seite 17 - 7 Roll Sensor Installation

219 Connecting the Sensors to the CANbus 1. Route cable C03 from the input module to the 8-way coupler (E11). 2. Connect the boom frame roll se

Seite 18

2210 Hydraulic Installation Ensure all pressure has been bled from the system before disconnecting any lines or fittings. Hydraulic pressure wi

Seite 19

2310.2 Valve Block Mounting 1. Mount the valve block on the center section of the boom as illustrated in Figure 22. 2. Insert the threaded rod

Seite 20 - 8 Module Installation

2410.3 Hydraulic Plumbing From this point on in the installation the booms will be inoperative until the hydraulics are fully installed. 1. Aft

Seite 21 - 8.2 Valve Module

2511 Software Setup 1. Start up the sprayer and test the sprayer’s functionality. The display terminal does not need to be powered on for the

Seite 22

2612 Cable Drawings 12.1 ITEM C01: 43220-10 - CABLE UC5 NETWORK 14 AWG - 10M 12.2 ITEM C02: 43220-01 - CABLE UC5 NETWORK 14 AWG - 1M

Seite 23 - 8.3 Input Module

Contents 1 Introduction ... 12

Seite 24

2712.3 ITEM C03: 43220-03 - CABLE UC5 NETWORK 14 AWG - 3M 12.4 ITEM C05: 43210-20 - CABLE UC5 NETWORK 18 AWG - 20M

Seite 25 - 10 Hydraulic Installation

2812.5 ITEM C06: 43220-05 - CABLE UC5 NETWORK 14 AWG - 5M 12.6 ITEM C10: 43230-04 – CABLE UC5 VALVE DT TO DT

Seite 26 - 10.2 Valve Block Mounting

2912.7 ITEM C20: 43240-01 – CABLE UC5 INTERFACE TILT DT

Seite 27 - 10.3 Hydraulic Plumbing

3012.8 ITEM C21: 43240-07 – CABLE UC5 INTERFACE MAIN DT (WITH AUX 1 & 2)

Seite 28 - 11 Software Setup

3112.9 ITEM C30: 43250-06 – CABLE UC5 BATTERY PIGTAIL FUSED

Seite 29 - 12 Cable Drawings

Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P

Seite 30

11 Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Control System. This system is manufactured with top quality comp

Seite 31

22 Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject t

Seite 32

33 General UC5 System Layout Figure 1 illustrates the general layout of the UC5 system components: Figure 1: General UC5 System Layout

Seite 33 - (WITH AUX 1 & 2)

44 Kit Parts 4.1 Kit Overview Figure 2: SM04 System Parts

Seite 34

54.2 Hydraulic Plumbing Figure 3: SM04 Hydraulic Plumbing Parts marked with an asterisk (*) are from 44865-50.

Seite 35

64.3 List of Parts Item Part Number Name QuantityB05 44706-01 KIT CABLE TIE BLACK 10 PCS 21 IN 150 PCS 7.5 IN 1B13 44728 MOUNTING BRACKET COMPLE

Kommentare zu diesen Handbüchern

Keine Kommentare