Rogator (‘54, ’64, ‘74 & ’84 Series and 1386) Installation Manual RG04 & RG06
74.4 RG04 Hydraulics (For sprayers with JIC fittings) Item Part Number Name QuantityH02 44863-04 HOSE ASSEMBLY 122R2-06 135 IN L 6FJX 6FJX 1H03 4
8Hydraulic Fitting Kit Details (P/N: 44865-25): Item Part Number Name QuantityPictureF02 103839 TEE ADAPTER - 6FJXR 6MJT 3F03 104632 TEE ADAPTER -
94.5 RG06 Hydraulics (For sprayers with Flat Faced O-ring fittings) Item Part Number Name QuantityH02 44863-25 HOSE ASSEMBLY 122R2-06 136 IN L 6F
10Hydraulic Fitting Kit Details (P/N: 44865-54): Item Part Number Name Quantity PictureF02 104586 TEE ADAPTER - 6FORXR 6MORT 3F03 104885 TEE ADAPT
114.6 Alternate Cabling Some Rogator sprayers may require different cabling depending on the connectors used near the valve block. Please refer t
125 Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfol
136 Ultrasonic Sensor Installation 6.1 Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instruct
146.2 Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, a
156.3 Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error.
166.4 Wing Sensor Installation 1. The sensor bracket should be oriented forward (ahead of the boom). 2. Typically the best mounting location fo
Printed in Canada Copyright 2009 by NORAC Systems International Inc. Reorder P/N: UC5-BC-RG04-INST Rev M (Rogator ‘54, ’64, ‘74 & ’84 Series and
176.5 Main Lift Sensor Installation Figure 10: Main Lift Bracket Assembly 1. There are a variety of ways to mount the main lift bracket on mos
187 Roll Sensor Installation 7.1 Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine
197.2 Roll Sensor Mounting Guidelines: Center Pivot Booms 1. When mounting the roll sensors, mount one to the boom frame and one to the chassis
207.3 Roll Sensor Mounting on a Rogator Sprayer Figure 16: Roll Sensor Mounting (Viewed from the rear of sprayer)
218 Module Installation An optional module mounting bracket kit is available for purchase from NORAC. The mounting brackets are compatible with
228.2 Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards
23 Figure 20: Valve Module Bracket Installation 5. Connect the valve module CANbus to cable C01 from the control module. Route cable C02 from
248.3 Input Module 1. Install the input module (E03) on the sprayer near the NORAC valve block. Secure it to the boom using cable ties or optio
25 Figure 23: Rogator Valve Block Figure 24: Solenoid Connections for Rogator Valve Block
26 Figure 25: Rogator ’64 / ’74 Valve Block Connections 8. If the sprayer is equipped with a bypass valve, insert the connector labeled “Aux 1” i
Contents 1 Introduction ... 12
279 Connecting the Sensors to the CANbus 1. Route cable C03 from the input module to the 8-way coupler (E11). 2. Connect both roll sensors to t
2810 Hydraulic Installation This manual covers two styles of hydraulics. Be sure to follow the hydraulic sections that correspond to the correct
29 Figure 27: NORAC Valve Block Details 10.3 Valve Block Mounting 1. A suitable mounting location for the valve block on the Rogato
3010.4 Hydraulic Plumbing for RG04 (JIC Fittings) From this point on in the installation the booms will be inoperative until the hydraulics are
3110. Connect each of the two H04 hoses to the corresponding left and right “B” port on the NORAC valve block. Insert the 6FJXR 6MJT tee (F02) be
3210.5 Hydraulic Plumbing For RG06 (Flat Faced O-Ring Fittings) From this point on in the installation the booms will be inoperative until the h
3310. Connect each of the two H04 hoses to the corresponding left and right “B” port on the NORAC valve block. Insert the 6FORXR 6MORT tee (F02)
3411 Software Setup 1. Start up the sprayer and test the sprayer’s functionality. The display terminal does not need to be powered on for the o
3512 Cable Drawings 12.1 ITEM C01: 43220-10 - CABLE UC5 NETWORK 14 AWG - 10M 12.2 ITEM C02: 43220-01 - CABLE UC5 NETWORK 14 AWG - 1M
3612.3 ITEM C03: 43220-03 - CABLE UC5 NETWORK 14 AWG - 3M 12.4 ITEM C05: 43210-20 - CABLE UC5 NETWORK 18 AWG - 20M
11 Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Control System. This system is manufactured with top quality comp
3712.5 ITEM C10: 43230-04 – CABLE UC5 VALVE DT TO DT
3812.6 ITEM C20: 43240-01 – CABLE UC5 INTERFACE TILT DT
3912.7 ITEM C21: 43240-07 – CABLE UC5 INTERFACE MAIN DT (WITH AUX 1 & 2)
4012.8 ITEM C30: 43250-04 – CABLE UC5 BATTERY AMP FUSED
Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P
22 Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject t
33 General UC5 System Layout Figure 1 illustrates the general layout of the UC5 system components: Figure 1: General UC5 System Layout
44 Kit Parts 4.1 Kit Overview Figure 2: RG04/RG06 System Parts
54.2 Hydraulic Plumbing Figure 3: RG04/RG06 Hydraulic Plumbing
64.3 List of Parts This manual covers installation using both JIC and flat faced o-ring fittings. Before starting the installation compare the N
Kommentare zu diesen Handbüchern